Áras Chill Dara is the administrative headquarters of Co. Kildare. The building has an overall floor area of around 12500 m².
WestLAN were awarded the contact to install a complete active and passive newtork infrastructure. The structured cabling project ran to 2600 points across 8 Comms Rooms interconnected with diverse route fibreoptic cable based on a hub-and-spoke design. A resiliant 3Com L3/L2 switched network was designed and installed by WestLAN.